土地扰动
Any activity which involves the moving of large quantities of dirt (within an area of 5,000 s.f. or more) on a site not being developed for a single-family residential building will require a land disturbance permit. There are instances when a 土地扰动 Permit may be required for the building of a home. To determine whether or not an LDP is required for the activity you are planning, please contact the 社区发展 Office at 770-467-4254.
Buffers are a protective tree lining along state waters, valuable in conserving land and water resources; therefore buffers should be protected. The buffer variance process will apply to all projects legally eligible for variances and to all state waters having vegetation wrested from the channel by normal stream flow, provided that adequate erosion control measures are incorporated in the project plans and specifications are implemented. The following are helpful links if contemplating construction within a buffer zone.
- Variance Application for 25’ Vegetative Buffer Encroachment [2014年3月修订]
- Buffer Variance Rules and Regulations [2013年9月修订]
绿皮书
The forward of the Manual for Erosion and Sediment Control in Georgia 2016 Edition, also known as “绿皮书” states: “Perhaps the most harmful damage to Georgia’s land and water resources is incurred through unchecked and uncorrected erosion and sediment deposition. Years of work have done much to remedy the situation. There has also been created an awareness that efforts must continue to further reduce the volume of sediment pollution in all the state’s waters. While ongoing work in soil and water conservation has been of considerable success, it was recognized that some state regulations of land-disturbing activities could add a needed dimension to the overall control effort. The General Assembly responded to this need, and in 1975, the Erosion and Sedimentation Act (O.C.G.A. §12-7-1等.)通过了. The Act has been amended several times since then. The Act requires counties and municipalities to have erosion and sediment control ordinances or be covered under state regulations. While the 土壤 and Water conservation Districts provide assistance in this at the local level, the State 土壤 and Water Conservation Commission provides expert, step-by-step guidance for activities under such ordinances through a comprehensive publication of reference information. Thus the “Manual for Erosion and Sediment Control in Georgia” can serve as a technical guide in formulating plans for land-disturbing activities.”
侵蚀控制手册 in Georgia 2016 Edition
Notice of Intent (NOI) / Notice of Termination (NOT):
A Notice of Intent (NOI) is the permit to be completed and submitted to the Georgia 环境 Protection Division as well as a copy given to the Local Issuing Authority when distributing an area of 1 acre or more. To access these forms please click the links below:
点击这里 to link to “Georgia EPD Online System (GEOS) for Permitting and Compliance Information”
地球观测系统-公众
Georgia Stormwater Management MANUAL
雨水管理计划 for EPD General Permit No. GAG610000
地盘检讨工具 (Note you must have Excel to download this form)
流域研究 – Existing Land Use Map
非法排放:
非法排放信息
雨水、下水道、 & 腐败的基础知识
非法排放的基本知识
非法排放检测 & 跟踪指导